The Permanent Asphalt Regeneration Cycle: Why Road Repair Takes 127% Longer Than The Road Was Usable
Satire on never-ending road construction, arguing that the projects operate under a Permanent Asphalt Regeneration Cycle that mandates repairs take 127% longer than the time